Peacock Engineering - EAM, Scheduling & Mobile Workforce Solutions
Select Page

Reconfiguring Maximo for the Energy from Waste Industry

Peacock Engineering’s client, Outotec, needed to reconfigure Maximo® to work for their Energy-from-Waste project in the UK. Read how we helped them do it, including:

• Migrating their existing cloud server
• Increased ability to plan & allocate resources

ATEX inspections for Storengy

Peacock Engineering upgraded Storengy’s IBM Maximo® system, so they could continue to:

• Manage the condition of assets
• Conduct ATEX inspections on 6000+ assets
• Hold data in Maximo
• Produce necessary certificates for compliance