Peacock Engineering - EAM, Scheduling & Mobile Workforce Solutions
Select Page

Reconfiguring Maximo for the Energy from Waste Industry

Peacock Engineering’s client, Outotec, needed to reconfigure Maximo® to work for their Energy-from-Waste project in the UK. Read how we helped them do it, including:

• Migrating their existing cloud server
• Increased ability to plan & allocate resources

Removing educated guesses from critical decisions

One of Peacock Engineering’s clients, Outotec, talk about their journey with us. Our implementation of Maximo® has helped them to:

• Reduce maintenance costs
• Maximise asset lifecycles
• Increase confidence & reliability in critical asset intelligence

ATEX inspections for Storengy

Peacock Engineering upgraded Storengy’s IBM Maximo® system, so they could continue to:

• Manage the condition of assets
• Conduct ATEX inspections on 6000+ assets
• Hold data in Maximo
• Produce necessary certificates for compliance

Flogas Britain Ltd – developing its IBM Maximo® system

Flogas Britain benefitted from an updated Maximo® system that helped them to:

• Ensure asset performance and integrity
• Monitor asset maintenance data
• Manage equipment and location data
• Oversee inspections in overseas operations